Water And Electricity Materials Entry Check

The entry of hydropower materials means the start of decoration and construction, and the acceptance of hydropower materials must be strictly checked, such as the quality, specification, and quantity of hydropower materials must be consistent with the procurement contract. Therefore, the inspector must conduct necessary inspections for each hydropower material entering the site. What is the acceptance process for hydropower materials entering the site? What are the precautions for the acceptance of hydropower materials?


The following parts need to be understood for the entry check of hydropower consumables

1. List of materials for hydropower renovation

2. Price details of water and electricity installation materials

3. Attention and installation of hydroelectric materials

4. On-site acceptance of hydropower materials


On-site acceptance process of hydropower materials:

* Notify the construction party of the time of acceptance of materials

It is best to arrange for the acceptance of materials to be carried out immediately when the materials enter the site, so it is very necessary to agree on the acceptance time. In order to avoid the occurrence of materials entering the site, there is no time agreement, and the materials will be checked and accepted, which will affect the construction progress.

* The acceptance personnel specified in the contract must be present

After the materials enter the site, the acceptance person must be present to sign for receipt, so as to avoid unnecessary troubles or disputes in the later stage. During the acceptance of materials, the decoration company will notify the customer to visit the construction site, and the supervisor will provide cooperation and guidance. The owner can also check on site with contracts, quotations and rulers.

* Acceptance procedures must be strict

The acceptance person should carry out the necessary inspection for each material agreement stipulated in the contract, such as material quality, material specification, material quantity.

* After the acceptance is passed, sign the acceptance form

If the inspection result is qualified, the inspector should sign the material acceptance form. Doing so is a more complete process. In order to avoid disputes arising from failure to complete the necessary procedures and later regret not admitting the account, but there is no evidence in hand.


The above is the sharing of relevant content about the entry of hydropower consumables, I hope it will be helpful to everyone. We are one of the big suppliers of energy meter and water meter. Our products are mainly smart products, such as smart wifi electric meter, wifi water meter, lora electric meter, lora water meter, remote control electric meter, remote control water meter, etc. If you are looking for any meter, please feel free to contact us.